STK specializes in designing and manufacturing o-rings, seals and rubber parts to serve most industrial markets, especially in household, automotive, electrical appliances and petrochemical valves & pumps industries etc.
With support from responsive customer service, expertise engineer and R&D teams, company aims to export high-quality products to the global market.
From customer-oriented and technoloty-oriented stand points, we offer the part of high standard focusing on reliability, services and meeting our customer needs.
Rubber Molding Part Display
Certificate
Production Capacity
Product Name |
OEM Custom Manufacturer Silicone Cake Pan Colorful Bakeware Rubber Molding |
Service |
OEM OR ODM |
Part Material |
Silicone or rubber (NR, NBR,SBR,BR,IR,CR,EPDM,IIR,VITON(FKM),SIR, PU, ACM, CO, etc |
Material Hardness |
Silicone about 5~90 Shore A; rubber about 10~90 Shore A |
Size |
Customized |
Shape |
Customized |
Color |
Customized according to Pantone colors |
Appearance |
as customer's requirement |
Drawings |
2D OR 3D acceptable |
Temperature Resistance |
-40~300 degree centigrade |
Tolerance |
0.05mm |
Technology |
Hot pressing molding or injection Molding |
Second Processing |
Vulcanizing/ Debur/ Silk-screen/Carving/printing |
Quality control |
Internal QC control |
Part Feature |
1.Oxidation , Chemical, oil, acid ,alkali , weather resistance |
2. colorful ,Anti-aging, good flexibility, good elasticity |
MOQ |
Amount : More than USD 500/each part(depends on specific part) |
Shipping ways |
1. By sea from Xiamen port 2. By express: DHL/UPS/FEDEX ,etc 3. By air |
Package |
Normally PE bag + carton or customized as customer's request |
Price Term |
Ex-works; FOB Xiamen |
Payment Term |
Sample mold: 100% prepaid Mass production mold: 50% deposit by T/T in advance, balance 50% paid against the samples approval. |
Mass production : (T/T, L/C, Western Union) 50% deposit, 50% before shipment |
Lead time |
5~10 days for first article,10~25 days for mass production parts (depends on part structure & production volume) |
Specification |
Confirm to ISO-9001 and ROHS Directive Compliant Green Products |
Application field |
1. Electronic components 2. Medical equipment 3. Home appliance 4. Mechanical equipment 5. Office facilities 6. Aviation 7. Construction 8. Automobile |
Mold tooling lead time |
3-7 weeks |
Production lead time |
2-4 weeks |
Feature |
High quality, reasonalble price, high-tech equipment and promptly delivery. |
Company Information
Our service:
1) Free samples for you to check the quality before ordering.
2)OEM & ODM are highly welcome, we provide full technical support for free.
3)100% responsible for our products, supply active feedback within 24 hours and solutions in short time; supply rework or refund if the mistake caused by us.
Material Preparing
1. Color Masterbatch 2. Raw Material Mixing 3. Raw Material Cutting 4. Mold Checking
Oil pressing Molding Process
1. Rubber / Silicone Material Feeding 2. Hot Pressing Molding
Secondary Processing
1. Automatic Burrs Removing 2. Burrs Removing
Packing & Delivery
FAQ
1. Are you trading company or manufacturer ?
We are factory. We are experienced manufacturer, have our own factory and warehouse.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-30 days for the OEM Parts, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but do not pay the cost of freight.
4. What is your terms of payment ?
Our preferential payment term is T/T
Mould Tooling : 50% down payment, 50% balance against the sample approval.
Mass Production: 50% down payment , 50% against the B/L copy
5. What do we need if you want a quote?
Please kindly send us your 2D & 3D drawing of your product.
The need the detail specifications as follows :
1. Material
2. Surface treatment
3. Estimated production volume
6. How do I know about the production ?
We will double confirm your requirements and send you the samples before the mass production . During the mass production , we will keep you informed of any progress. Besides, we will do 100% quality inspection before shipment.
7. How do we know about the delivery status ?
We will immediately inform you the tracking number once we get it from shipping agent.
Besides, we will update the latest shipping information.
If you have any other question, please feel free to contact us !